Cultural

Extension of the music school of Saint Sébastien sur Loire

Project manager : Vignault x Faure.

Mission:

The study is carried out in the rehearsal rooms for amplified music (with modular reverberation), the auditorium (with the constructive principle of "box in the box" and modular reverberation) as well as the recording studio and controlled acoustic diffusion).

musée à VANNES serdB

Cultural

Construction of the edutainment museum in Vannes as well as its  4D cinema, restaurant and exhibitions

Project manager: ENTRE-SOLS

Mission:

  • Complete Acoustic study
  • Site supervision and reception
Restructuration du passage de la Châtelaine Nantes-serdB

Housing

Restructuring of the passage of Chatelaine Nantes

Project manager : GMAA: project management for the design and implementation

Mission:

  • Full acoustic study
  • Follow up, monitoring and commisioning
  • Additional Mission: residual noise measurement
  • BREEAM Certification
Acoustic study of Faculty of medicine

Higher education

Extension and restructuring of Faculty of medicine (Kremlin-Bicêtre)

Project manager:    Jean-Philippe PARGADE

Missions:  

  • Complete acoustic study
  • Follow up and acceptance of completed works

HQE Certification (High Environmental Quality)

Acoustic study of the House of Culture

Culture

Construction of the House of Culture (Bourges)

Project manager:   IVARS & BALLET

Missions:  

  • Complete acoustic study
  • Follow up and acceptance of completed works

 

Carcassonne Hospital centre  acoustic study

Health

Designing and building of the Hospital centre (Carcassonne)  

Project manager:  LEIBAR AND SEIGNEURIN (architects) & RAUM (architect)

Missions:  A.I.A

  • Complete acoustic study
  • Follow up and acceptance of completed works

The first French hospital centre with HQE certification (High Environmental Quality) at level "exceptional" (source: Le Moniteur No. 5787 October 2014)

 

 

 

 acoustic study of groupe scolaire La Minais

Enseignement

Construction of the school complex La Minais (Sainte-Luce-sur-Loire) 

Project manager:   Murisserie PARENT-RACHDI

Missions:  

  • Complete acoustic study
  • Follow up and acceptance of completed works

HQE Certification (High Environmental Quality)

îlot PSA CitroënAcoustic study

Apartments

Construction of the l'Ilot PSA Citroën « LE NANT’ILE » (Nantes)

Project manager:  LEIBAR & SEIGNEURIN (architects) and RAUM (architect)

Missions:

  • Complete acoustic study
  • Follow up and acceptance of completed works
  • Complementary mission: Residual noise acoustic measurements